- Arts & Culture 5952
- Business & Economics 689
- Computers 317
- Dictionaries & Encyclopedias 81
- Education & Science 76477
- Abstracts 252
- Astrology 4
- Astronomy 1
- Biology 8
- Chemistry 2513
- Coursework 15782
- Culture 9
- Diplomas 411
- Drawings 571
- Ecology 6
- Economy 82
- English 78
- Ethics, Aesthetics 3
- For Education Students 17626
- Foreign Languages 11
- Geography 3
- Geology 1
- History 89
- Maps & Atlases 5
- Mathematics 13871
- Musical Literature 2
- Pedagogics 19
- Philosophy 23
- Physics 14894
- Political Science 5
- Practical Work 101
- Psychology 60
- Religion 4
- Russian and culture of speech 8
- School Textbooks 7
- Sexology 42
- Sociology 9
- Summaries, Cribs 87
- Test Answers 151
- Tests 9245
- Textbooks for Colleges and Universities 32
- Theses 24
- To Help Graduate Students 14
- To Help the Entrant 37
- Vetting 364
- Works 13
- Информатика 10
- Engineering 3060
- Fiction 696
- House, Family & Entertainment 107
- Law 132
- Website Promotion 71
Architectural and constructive design of an industrial
Refunds: 0
Uploaded: 25.12.2017
Content: arkhitekturno-konstruktivnyy-proekt.rar 960,16 kB
Additional information
Lis 1: Facade of the M 1: 200 building complex, Longitudinal section of the production building 2-2 M 1: 200, M 1: 200 production building plan, Master plan with wind rose M 1: 2000, Explication of buildings and structures, Balance of territory.
Sheet 2: Cross section of the production building 1-1 M 1: 200, Constructive section of the ABK on the wall M 1:25, Construction section of the production building on the wall M 1:25, Layout and roofing of the production building 1: 400, Layout of the foundations of the production building 1: 400, Technical and economic indicators of the production building.
Sheet 3: Plan of the first floor of ABK M 1: 100, Plan of the second floor of ABK M 1: 100, explication of the premises of ABK, Section of ABK of the building in the staircase M 1: 100, Layout of the foundation and floors of ABK M 1: 200, 1: 200, Technical and economic indicators of ABA.
The contents of the explanatory note:
1. Original design data
2. Description of climatic conditions of the construction area
3. Description of the master plan, balance of the territory
4.Proizvodstvennoe building
4.1. Quantitative-planning solution
4.2.Architectural and constructive solution (with sketches of structural elements)
4.2.1. Foundations and foundation beams
4.2.2. Columns of the main frame and half-timbered frame
4.2.3. Pod crane beams
4.2.4. Stringing and undergrowth constructions
4.2.5. Lights
4.2.6. The communication system
4.2.7. Coating plates
4.2.8. The construction of the roof (with the thermal calculation of the cover and the calculation of the number of drainage funnels)
4.2.9. External walls (with thermo-technical calculation of the thickness of wall panels)
4.2.10.Explanation of floors
4.2.11. Doors, gates
4.2.12. Work platforms, stairs
4.3.External and internal finishing
4.4.engineering networks
4.5.Techniko economic indicators of a production building
Calculation of the area of light holes
5. Administrative and household building
5.1. Calculation of ABA based on the number of workers in the shop
5.2. Volume-planning decision of ABC
5.3.Architectural and constructive decision of ABK (with sketches of structural elements)
5.3.1. Foundations and foundation beams
5.3.2. Structure of the framework according to the AI-04 series (columns, crossbars, slabs, stiffening diaphragms)
5.3.3. The construction of the roof (with thermo-technical calculation of the thickness of the insulation)
5.3.4. External walls (with thermo-technical calculation of thickness of wall panels) and internal partitions
5.3.5.Explanation of floors
5.3.6. Windows, doors
5.4. Outer and inner decoration
5.5. Engineering networks
5.6.Technico economic indicators ABA
Download the sample: http://pgsfiles.ru/engine/download.php?id=92
Note: The file format is RAR archive [960,15 Kb]: Drawings in the format: DWG - Autodesk AutoCAD + Explanatory note in the format: DOC - Microsoft Office Word
Feedback
0Period | |||
1 month | 3 months | 12 months | |
0 | 0 | 0 | |
0 | 0 | 0 |